top of page

Popular Building Inspections and Reports 

 Building Condition
Reports 

Captive condition report of a building at a given point in time

Concise Identification

and Reporting defective and non compliant items of works 

 Incomplete Works 

Items of Incomplete Works during construction (stages) and completion of works

 VCAT Compliant 

Expert Witness Report For:

Mediation

Tribunal & Courts​

Protect Yourself from unfair building damage claims

Limiting all stakeholders liability

 Building Stage Reports

Critical construction stage Inspection & Report. Including mandatory RBS stages

 Knockdown Rebuild

Insure you're not made responsible for unfair damage claims during demolition & construction

 Owner Builder

Stage and Compliance Inspections & Section 137B Reports

 More Reports

Comprehensive list of Inspections - Reports available

An increasing number of Industry

Authorities recommend New Home

Buyers protect their interests when

building by engaging their Own

Independent Building Inspector

New Home after final Inspection

Our Owner Assistance Consultation is available: In person - onsite, Over the phone or Skype. “It is in both the Owner and the Builder’s best interest to resolve building matters amicably if possible before the situation escalates to a legal setting” For Your free 30-minute consultation Peter at ConsulTec for actionable steps and expert advice.

Building Report Process

Step 1. Contact Peter at ConsulTec to discuss your concerns and answer your questions. This is your opportunity to simply ask some questions to help you better understand the Site Inspection and Building Report Process. Discussion of your particular building situation and any concerns you have. Booking a Consultation Meeting, this can be either on site or off site depending on your preference and requirements

Step 2. Consultation meeting, (Yourself & Peter), compile property details, discuss your Report Requirements Request any relevant property / building documents not already at hand, including building certificates. ConsulTec can retrieve numerous building documents if/as required on your behalf (with your authority) Respond to any further questions you may have. Contact details of any other parties involved. If the proposed Report is to be performed on an a neighbour’s property, ConsulTec will contact relevant parties to arrange authority to access and inspect the property

Step 3. Inspection of your property by ConsulTec On Inspection Day, Peter inspects the entire property inside and out including discoverable - accessible areas, roof and subfloor areas. Comprehensive Film, Photographic and Dialogue capturing and recording of all condition aspects of the property including a property overview. Focus on any particular items you are concerned about and recorded in our House Inspection Checklist Depending on the nature of the property, the inspection of a building can require from 2 to 3 hours, to an entire day. You are welcome to attend and be involved on inspection day. This is an ideal time for you to point out any areas of concern you may have and further discussion around the same.

Step 4. ConsulTec processes and completes your comprehensive Dilapidation Report, Transparent and Unbiased. Upon completion of your building inspection & property inspection, ConsulTec completes your Report in the time recorded in the agreement Including: Extensive photographic record of the property Descriptive dialogue accompanying the photographic record Link(s) to any film footage recorded at the property All ConsulTec Reports comply with Australian Standard AS 4349-1-2007 Inspection of Buildings VCAT Compliant Reports (Victorian Civil Administrative Tribunal) in accordance with Pratice Note

Step 5. Delivery of your Property Condition Report and Familiarisation Electronic and Hard Copy versions of your property and building report delivered on or before the date recorded in the agreement. Complimentary face to face, zoom or phone meeting to further discuss your report and answer any queries you may have.

Non compliant shower screen

Resolving Your Building Concerns

​
1. Review your Building Documents including Permits, Approved Plans, Specifications, Building Contract and any Signed or Unsigned Variations generated to date, so your most relevant information is front of mind when you address your Builder.
​

2. Discuss with your builder and make him aware of your concerns as soon as they arise, verbally and in writing is most effective.

​​

3. If discussion with your builder doesn’t achieve resolution of your building concerns, contact ConsulTec for assistance. ConsulTec offers a free of charge and obligation free 30-minute consultation (Owner Assistance Consultation) to discuss and understand your concerns. We then advise your best course of action to resolve your building concerns and answer any questions you may have.

​​

Our Owner Assistance Consultation is available: In person - onsite, Over the phone or Skype.

“It is in both the Owner and the Builder’s best interest to resolve building matters amicably if possible before the situation escalates to a legal setting”

 For Your free 30-minute consultation Peter at ConsulTec for actionable steps and expert advice.

 

4. ConsulTec performs a ‘Building Inspection’ and compiles a ‘Building Report’ identifying not only your concerns, but all aspects of your building including: defective works, workmanship issues, contract and building code compliance. We the offer advice to the most effective and efficient path forward to resolve your building concerns.

 

​

It should be noted, with the correct inspections – building report and personalised assistance from ConsulTec, a lot can be achieved and acceptable resolutions reached without resorting to legal action and litigation as a first course of action. Naturally, the later remains as an option for you.

Inspector in front of new frame_edited_e
Completed Build with ConsulTec Services
Inspection Frequency - Building Stage(s)

“When should I engage my ConsulTec Independent Building Inspector to conduct my building stage inspections?”
​

Depending on your individual requirements, prior to signing your Building Contract with your Builder is the most effective time to engage your independent Inspector. Advantages of having your independent inspector on board at this stage include a 'second set of eyes' to examine and vet your Building Contract to ensure it does'nt include any unreasonable or unfair conditions (prior to you signing the contract).
 
Alternatively, at or beyond ‘Building Permit Application Stage’ (when your Registered Building Practitioner - RBS has submitted the building permit application to the Registered Building Surveyor-RBS). When the Building Permit has been issued, on your behalf ConsulTec conducts a ‘document discovery’ to access
all approved plans and approved permit documents. Engaging your own inspector at any stage of your build gives your control, peace of mind and security for the duration of your build.
Just one facet of our inspection process is to ensure your new build complies with the approved documentation.
​
In Line with Registered Building Practitioner (RBS) mandatory inspections, Your ConsulTec Building Stage Inspection and Report will be completed and delivered to you in a stipulated time frame at the completion of each stage. To enhance your peace of mind, we monitor the quality, compliance and completeness of the staged works, your report also assists interactions with your financial institution, when you are verifying or declining stage payments to the builder (or other involved contractor). Your Building Report provides the evidence based information you need to avoid making stage payments while incomplete or defective works exist.
 
Usual Mandatory Inspections for New Home Construction
-       Steel reinforcement-foundations pre-concrete pour (Slab Stage)
-       Frame Stage prior to roof-cladding instal
-       Completion Stage – Occupancy
The above is the baseline inspection frequency, more frequent inspections can be added as required increasing the scrutiny of your build and reducing the possibility of non-compliant and sub-standard works being concealed by the progression of building works and overlooked, see more at OTHER BUILDING INSPECTIONS
​
“Is it too late to engage my Independent Building Inspector?”
​
While prior to commencement of your build is the most effective time to engage you Independent Inspector, if you feel you have unresolved building issues during your build or even disagreement-dispute with your builder, it will be beneficial for you to engage your independent inspector promptly (during construction), ideally prior to handover of the property. You maintain advantage when your raise your building concerns prior to the completion of the contract works.
 
As your independent building inspector, our inspection of a building and building defect reports are completed in accordance with Australian Standard 4349.1-2007


 

Building - Property Reports in More Detail

Building Condition Reports

Your Building - Property Survey and Report captures a holistic and detail snapshot on the condition of your property or building at a given point in time. Furthermore it will record details of items concerning safety, wear & tear, deterioration requiring urgent attention in residential and commercial settings. The Survey - Report examines all areas of the Building(s) Internally and Externally, the site and a limited snapshot of the adjoining properties.

​

Stakeholders who benefit from a Condition Report:

  • Property Owners, particularly if they are intending to set the property to a rental or lease situation.

  • Building Contractors, Property Developers and Lenders, particularly when renovation development works are planned at the property.

  •  Insurance providers.

  • Any third party with an interest in the property.

​

The Report is further invaluable when it is conducted prior to any significant construction - development are planned nearby, including in Council Street Frontage area.​​​

​

Scope of Your Building Report
 
There is no real ‘one size fits all’ type of building report.
The Scope of the report is generated by several factors:
  • The type of Building Report you have requested
  • The number of items you have requested specifically for inspection and report
  • The size and complexity of your building
  • The combined number of ‘items detected’ requiring recommendations at the building inspection
  • Certain Building Inspections may require the engagement of independent Building Engineers
ConsulTec inspector at sight survey
Building Condition Reports

Defective Works Inspection - Report in More Detail

The Building Inspection – Report process for defective works and incomplete works is usually reciprocal and can feature in the same building report, as both are usually recorded during the building inspection. In most settings, if the home owner has concerns around defective works for example, they will have similar concerns around incomplete works.

Naturally the choice is yours, happy to discuss this aspect at our Consultation Meeting and then will proceed as directed by you.

​

With your approval ConsulTec will arrange site access for the Building Inspection direct with your Builder, and / or any

other involved stakeholders, the Building Engineer for example.

​Your Building Report will include:

- Formatted and numbered detailed point form documentary of each item of Incomplete Works with supporting photographic

evidence.

​- The Defective Works are detailed in the same manner as above, in addition they include reference to the Relevant Building

Code, Australian Standard, VBA Guidelines and Practice Notes. Recommended Building Rectification works for each

Defective Item.

​

Cost(s) for Rectification Works can be included upon request.

​

Virtual Tour and Arial View footage is available upon request.

​

Partnering with ConsulTec relieves your worry and concerns to support an enjoyable

experience ensuring you achieve the new home build you signed up for!

For your reference, if you are arranging your Building Defects Survey and Report, it is worth considering the likelihood you may require a VCAT Compliant Report. While Your VCAT is based on the Defects Report, it carries additional ability in a number of areas including:

Putting your Builder on notice to rectify Defective Works

Is admissible expert witness - evidence in a Mediation

VCAT & Court Settings

Inspection process provides complete list of building defects

Incomplete Works Inspection - Report in more detail

I'f you are encountering difficulty with your Builder and falling into dispute around incomplete works, a building report by an Independent Inspector is a most effective way to resolve the matter and get your build back on track and completed.

 
Another Building Owner Said Recently:
“When I challenged my builder about the unsightly gaps around my rangehood, he just said “that’s the way we always do it”, when I persisted with my complaint, he just rambled on with a bunch of technical reasons why it had to stay the way it was, he made no attempt to complete the installation and correct his faulty
workmanship-rangehood installation.”
​
As your build approaches or reaches 'Complete Stage' or 'Practical Completion' having your incomplete works report becomes even more critical. Incomplete items of works can be obscure to notice and detect in the busy time as your completion works are going on. It is crucial and in your best interest as the Home Owner, you are satisfied any - all incomplete works have been completed prior to handover - possession of your new build certainly prior to making the final contract payment.
 
'Practical Completion Inspection' (PCI) benefits and protects Home Owners in the final stage of the build, diligently inspecting and reporting on all aspects of your build ensuring all works are completed (as practically possible) prior to making their final contact payment.
​
Your Independent Inspector becomes your 'eyes on the ground' at this complex stage of your building contract also providing you assistance to avoid being manipulated into making the final payment while items of works are outstanding. 
​
Defective Works
Incomplete Works

VCAT Compliant Inspections - Reports in more detail

"Do I need a VCAT Compliant Report?"
​

Many different types of Building Reports are available from ConsulTec and the market. We understand it can be confusing if you’re not sure about the type of report best suites your requirements and be the most effective for you in your building matter. You can call us anytime without obligation if you would like further information on this topic. Therefore, care should be taken when choosing the type of report, you will want to avoid going through the building inspection and report process only find later, you need to get another inspection and report to be compliant and meet requirements effectively

​

The Victorian Civil and Appeals Tribunal (VCAT) will only proceed with matters supported by Building Reports that comply PNVCA2 -Expert Witness. Given the extended waiting time to have a case heard (currently up to two years,) if you intend to have your matter heard at VCAT, it is imperative you have a VCAT compliant report.  

​

These are more comprehensive than other reports, but more importantly are formatted to VCAT requirements.

Legal conclave for dispute resolution
VCAT Compliant Reports
Stressed home owners discussing their building dispute

VCAT Compliant Reports are particularly beneficial in alternate settings including:

​

  • Negotiation with your Builder

  • DBDRV

  • Arbitration

  • Conciliation

  • VCAT

  • Court & Tribunal Setting

You can read the following real life experience of a Home Owner with regret not obtaining a
VCAT Compliant Report, or read more on our VCAT Page
The Importance of VCAT Compliant Reports
We had a Client contact us recently (Let’s call him Jack),
Jack explained his Melbourne apartment had developed a number of building defects within the Builder’s Warranty period. One concerning defect was the upstairs balcony leaking into the living area below. Jack had tried various channels to have the builder return to rectify the defects (under warranty) without success. Jack decided to take his case to VCAT to resolve his builder’s warranty issues, he explained, this process commenced two years ago, all the while that balcony continued to leak, causing further building damage.
Worse was to come, Jack’s case finally had its day in VCAT, only to be met by a ‘Hearing Refusal’ from VCAT due to his Building Report not being VCAT Compliant! Jack’s disappointing life experience highlights the critical importance of ensuring your Building Report is VCAT Compliant in the Tribunal setting. A Correct Housing Inspection and Compliant Report are crucial in supporting your building case and achieving an acceptable outcome.
 
The journey and experience of building your new home should be exciting and enjoyable, not an event filled with worries and concerns about your build. Partnering in collaboration with ConsulTec to monitor your build, ensuring building compliance and acceptable workmanship standards are achieved, will enhance your confidence and peace of mind in your project, leaving you to enjoy the excitement and enjoyment.

Building Stage Reports in More Detail

ConsulTec provides Stage Inspection - Reports at any and all stages of your building project depending on your individual requirement.

It is worthy of note that the usually mandatory inspections in a residential setting under your RBS (Registered Building Surveyor) issued building permit are limited to:

  1. Slab - Foundation stage pre concrete placement

  2. Frame Inspection, prior to roof and cladding installation

  3. Final Inspection - Practical Completion - Occupancy

​

This seemingly limited inspection regime for a complete house builds provides a plethora of opportunity for non compliant work and compromised workmanship issues to be concealed by the ongoing construction of your home.

​

A range of attributes impact an ideal inspection stage frequency including but not limited to:

  • Your's as the Owner's ability to inspect and determine the construction process

  • Site and weather conditions prior to building commencement

  • The nature and level of complexity of your construction

  • Known Integrity and reliability of both your Builder & RBS

  • Competency of the of the Sub-Tradespeople and Building Supervisor - Manager involved

​

At our Consultation Meeting we can offer advice and discuss the frequency of inspections that is most suitable to your individual project, to secure your peace of mind and confidence as your building works proceed. While your Independent Inspector will perform the additional inspections you engage him for, he will also ensure the RBS Mandatory inspections

have been carried carried out with ​professionally ensuring compliance.

“Is it too late to engage my Independent Building Inspector?”

While prior to commencement of your build is the most effective time to engage you Independent Inspector, if you feel you have unresolved building issues during your build or even disagreement-dispute with your builder, it will be beneficial for you to engage your independent inspector promptly (during construction), ideally prior to handover of the property. You maintain advantage when your raise your building concerns prior to the completion of the contract works.

Building Stage Reports

Knockdown Rebuild Inspection - Reports in more Detail

By nature the 'Knockdown Rebuild' setting presents increased risk of attracting namely potential claims of building related property damage to nearby properties when compared to the open land subdivision setting.  Demolition of an existing structure and site re-establishment works do present this risk of damage to

nearby properties. Prior to commencement of any siteworks at the existing property, it is wise for you to consider obtaining a Dilapidation Report on adjoining properties that may be at risk.

You can read more about this in our 

Demolishing an existing residence comes with damage risk

Owner Builder Inspections - Reports in more Detail

Engaging your ConsulTec Independent Building Inspector can not only be crucial in the success of your Owner Build, but additionally provides peace of mind navigating and managing your construction in a methodical and compliant manner.

Knockdown Rebuild
Owner Builder Report in detail
Verification of Defective Works

A listing of a Defective Work item is verified by identifying its ‘non-compliance’ to:

  • Your Approved Plans & Building Documents

  • Building Act 1993

  • Building Regulations 2018

  • Plumbing Regulations 2018

  • Victorian Building Authority Guidelines

  • Relevant Australian Standards

  • Current Practice Notes

  • Building Certificates

 

This Report Information becomes invaluable to you in the event you need to liaise with or take Your Builder (Registered Building Practitioner RBP) to task for non-compliant, defective or incomplete works. Should that situation arise, your builder will see you as ‘having a handle on the build process’ and a strong understanding of your rights under the Building Contract. Having the report’s clear and concise information at hand also reduces the likelihood of disruptive arguments and excuse making and time delays when dealing with your builder around defective or incomplete works. Partnering with ConsulTec in a collaborative communicate dialogue with your builder, takes the weight and worries from your shoulders.

All reports delivered in Electronic and Hard Copies.

Virtual Tour and Ariel Footing of your property available upon request

When you engage ConsulTec to inspect the property with inspection for house, our holistic inspection approach ensures each and every aspect of your property and building(s) is captured for all time and presented in detail in your building inspector report.

ConsluTec Reports prepared to dedicated timelines
Verification Of Defective Works
Quality Assurance and Workmanship Matters Building Your New Home

Few us buy an established property without obtaining a Building Inspection or Pre-Purchase Inspection and Report, So why don’t we behave the same way when we are building a New Home? Given there is a surprisingly absence of control over build quality and workmanship standards throughout the home building-construction process!
​

New Home Buyers on their building journey generally believe the Registered Building Surveyor (RBS) who is responsible for the ‘Stage Inspections’ of the Building Permit, is further responsible for ensuring the ‘Quality of the Build’ ie: Quality of workmanship across the various trades people, particularly the build carpenter(s). The RBS is only responsible ensuring the work complies with the appropriate Codes and Standards, not for workmanship nor the quality and finish of the work performed on your new home.

​

The usual RBS mandatory inspections are limited to:

  • Steel reinforcement-foundations pre-concrete pour (Slab Stage)

  • Frame Stage prior to roof-cladding instal

  • Completion Stage - Occupancy​

 

At a minimum, you need assurance the work being performed for you meets National Construction Code, Australian Standards and Tolerances Guidelines. â€‹

​

A number of authority industry bodies are now recommending new home buyers planning to build a new home, engage an independent building inspector to monitor and report on the build process to:

 

  • Protect their Interest-investment with peace of mind

  • Confirm Compliance to relevant Codes, Standards and Associated Builder Requirements

  • Ensuring the delivery of Acceptable Standard quality, finish and workmanship.

  • Provide preventative support to help avoid falling into a Home Owner – Builder Dispute.

 

​

ConsulTec Building Reports generally range from 40 to 60+

pages ​depending on the size and complexity of your property,

including links to relevant cloud -based information files.

Comprehensive Photographic & Dialogue Expert Evidence

All reports delivered in Electronic and Hard Copies.

Virtual Tour and Ariel Footage available upon request

 

When you’re sourcing a building inspector in Melbourne for

your building inspection, please consider the benefits of a

building consultant with 40+ years of industry experience.

Consultec checking for structural compliance
Build Quality and Workmanship
Scope of Your Building Report

There is no real ‘one size fits all’ type of building report.

The Scope of the report is generated by several factors:

  • The type of Building Report you have requested

  • The number of items you have requested specifically for inspection and report

  • The size and complexity of your building

  • The combined number of ‘items detected’ at the building inspection

  • Certain Building Inspections may require the engagement of independent Building Engineers​​​​​​​

Melbourne New Home Buyer’s Deplorable Building Experience

At ConsulTec we recently had an inquiry from a new home purchaser (he had a new home built under contract and the home was now completed.)

Let’s call him Isaac.

Isaac gave me a brief outline of his building experience and where he is at now. Since moving into his new home some serious building defects had developed. Possible foundation failure appeared to present. Isaac attempted to have his builder return to inspect the home and arrange rectification works. Communications between Isaac and his Builder broke down to the point his builder severed all contact with Isaac.

Time passed then Isaac contacted the Domestic Building Insurance (DBI) and Victorian Managed Insurance Authority (VMIA), to lodge a claim against his builder for the rectification works. The response from the insurance authorities was that the legislation states: For a claim to be successfully lodged, the builder must have died, disappeared or become insolvent!

What a horror of a situation, Isaac can’t find nor contact his builder for recourse and builders warranty isn’t available to him unless one of the above events has happened to the builder.

​

​

​

​

​

​

​

​

​

​

​

Isaac was distraught and remains in a quandary what to do, he can’t demo the house and rebuild with another builder as all of his capital was invested in the first build. He can’t sell the property and go elsewhere. He can only sit and wait and hope for one of the triggers to validate his home owners warranty.

An independent building inspector may well have averted this disaster for Isaac.

Certain new home buyers see the cost of engaging an independent building inspector and building reports as an unjustified expense.

Clearly Isaac is facing a lot of unjustified expense, even if / when his warranty insurance kicks in.

The Importance of New Home Buyers engaging an Independent Building Inspector

If you’ve already read or scanned the above article, you’re probably feeling you would like a bit more confidence around the Regulatory Compliance of your new build. Developing an understanding of how exposed Victoria’s new home buyers are to building non-compliant work, building defects and workmanship issues might not be for everyone! And just choose to ‘go with the flow’ and hope for the best.

For everyone else who wants to embrace a peace of mind and enjoy their home building experience, engaging your building inspector - consultant to independently inspect and report to you through the various stages of construct will facilitate that peace of mind feeling for you.

In the knowledge your build work is being independently monitored from commencement to completion, inspected and reported upon at key intervals by ConsulTec protects your interest and enhances your home building experience. With your approval, ConsulTec will liaise with your Builder – Site Supervisor at a congenially acceptable throughout the construction process.

Peter is a third-generation builder and has more than forty years industry experience across all facets of residential construction.

Consultec assists in avoiding structural failures in your new home

In then absence of any path forward for him to address the building defects to his home, Isaac engaged the services of a Structural - Building Engineer to inspect his property and report on the building issues, then to provide Isaac with an actionable rectification plan.

If things seemed bad at this point, Isaac's building experience was about to deteriorate. The Consulting Engineer provided his  Building Report including proscribed rectification works to correct the building defects. The Engineer's recommendation was to demolish his house and rebuild it!

AUSTRALIAN STANDARDS, The industry's ability to comply ?

How can it be that the Australian standards related to building work are not freely available to all domestic building industry participants including the end user, you the homeowner.
If a person was to visit a building site today and asked any of the tradies which Australian Standard applied to the work they are performing, its unlikely they could identify the relevant standard, let alone their awareness of whether the work they are performing complied with the standard or not!
Noting all building participants and others are required to pay an ongoing, annual fee to access the Australian standards and continual updates. Of course we argue ‘professional Building Practitioners and other should manage their standards subscription cost as a business expense’. It is safe to entertain the thought that the exorbitant ongoing cost of the standards retards industry players to access them. I am sure there are numerous home owners who would like to access them when they have
concerns about their building compliance?


On the other hand, a large degree of our residential construction work is performed by our ‘up and coming’ younger and often inexperienced tradies, using an apprentice for example as he/she is also a cheaper labour unit, will have very little awareness at all of the Australian Standards, let alone access to them to familiarise themselves and apply them to their own work. It would in turn be argued the upline carpenter-supervisor-builder should be responsible for all work being compliant to the standards and associated codes, and that is correct. Particularly in the price driven housing markets, history shows that upline responsibility chain is often ineffective in ensuring compliance. The issue then falls to the last chance of compliance check with the RBS Registered Building Surveyor, see preceding articles around that topic!
​
My own years immersed in the building industry indicated to me very few players had access to or were familiar with the standards.
Some players might even deem the Australian Standards in the domestic building sector less important than other codes and regulations.
From a Building Consultant’s experience, I can advise, when a building project has fallen into dispute between a home buyer and a builder, then arrives at VCAT to attempt resolution, Compliance and reference to various Australian Standards features strongly in an Expert Witness’s Building Report Evidence to the Tribunal.

 

Further to, compliance to the Australian Standard is a regular feature in most other building reports that don’t proceed to VCAT, so its difficult to understand why the standards are given such little credence in the construction phase and so little attention to the construction compliance to them?

Noting the sample scathing reports in the previous section levelled at our various building regulators and questionable management of their budget spending, It is my opinion (which is not important at all) but you can draw your own conclusions, it’s fair to say making the Australian Standards freely available to all domestic building participants would encourage a greater compliance to them.

Other Sector Organisation who claim to ‘service the domestic building industry’ fall short in their ‘service’ by not providing free access to the Standards, Including the Housing Industry Association (HIA) and Master Builders Association (MBA)

As all of these organisations claim to have an interest in our building industry participants and builders performance

​

Point of Unrestricted Access to The Australian Standards Could Include:

  • Victorian Building Authority (VBA)

  • Master Builders Association (MBA)

  • Housing Industry Association (HIA)

  • Victorian Managed Insurance Authority (VMIA)

  • Domestic Building Insurance (DBI)

  • Registered Building Surveyors (RBS)

Comprehensive list of Inspections - Reports available

Menu All Building. Reports
New Homes
* Building Contract and Document Analysis * Pre-Construction site survey * Slab - Foundations prior to contract placement * Frame Stage prior to roof / cladding installation * Pre - Plaster to inspect services, insulation install and more * Fixing stage prior to painting to inspect wet area waterproofing, plaster integrity - finish and more * PCI - Practical Completion Inspection, conducted prior to contract completion and final payment to the builder * Home Owners Warranty Inspection, conducted prior to the expiration of the Domestic Building Insurance Warranty. * Progress Payments and Stage Claims by the Builder, These inspections / reports are conducted to ensure each stage is complete prior to making each stage payment to the Builder - Base Stage - Frame Stage - Lockup Stage - Fixing Stage - Completion - Claim stage for a Variation to Works * Alternatively your Building - Property inspection can be conducted at any stage of construction to respond to your individual requirements. OTHER INSPECTIONS * Knockdown Rebuild * Condition - Dilapidation * Incomplete Works * Defective - non compliant Works * Workmanship issues * VCAT Compliant Reports * Builders Warranty Claims * Building Compliance * Owner Builder Reports including Stage Reports * Builders Quality Assurance (QA)
Established Homes
* Condition - Dilapidation * Renovations & Extension Pre - Construction and progressive * Structural Assessment Inspection & Report * Rental Pre and Post Lease tenancy - occupation * House Insurance Claim reports * Maintenance and Safety Reports * Moisture Testing (including concealed environments) * Floor Level and Site Level Surveys * Home Insp * Building Maintenance advice and actionable planning. * Accessibility for persons with disabilities * Condition and Structural Reports when you are making a claim for damage to your caused by construction works nearby.
Non Residential
* Commercial Condition and Dilapidation * Non prescribed residential - property works including Landscaping, concreting, siteworks, drainage and more. * Council Assets, Services infrastructure and other adjacent to your property. * Protection Works Notice(s)
Avoid risk and maintain control of your building development

Together Let's Get Your Build Back on Track!

© ConsulTec Building Consultants

bottom of page